Centrisys Case Studies: Success Stories in Wastewater Treatment

Plant Replaces Modified Dewatering Centrifuges with Sludge Thickening Centrifuges

Written by Sample HubSpot User | Jul 5, 2022 9:21:23 PM

Location: City of Wyoming Clean Water Plant  |  Wyoming, Michigan
Plant Size: 90 MGD
Installation: 2019 (1) THK350 Sludge Thickener

OPERATING DATA
  • Feed @ 0.6-1.2% TS
  • 240 gpm average
  • 95% capture
  • <1 lb/ton polymer, active
  • <0.12 kW/gpm
  • 6.5% TS TWAS

PROBLEM

Two aging Bird 5100 modified dewatering centrifuges were needed to thicken WAS sludge to a total flow of 240 gpm. Each of the older Bird centrifuges operated at 80 kWh with a flow of 120 gpm. The large, accelerated mass and the relatively low flow rate of each unit were the primary sources for the plant’s high power consumption.

RESULTS

  • Installation of one THK350 replaced two large Bird 5100 centrifuges
  • Awarded an energy reduction grant due to the 75% power reduction, saving up to $88,300/yr ($0.08 kW/h)
  • Solids discharge controlled for either off-site or land application via the patented hydro-pneumatic air which further fine-tunes the sludge control
    • 3.5-4.5% TS for off-site pumping
    • 5.5-6.5% TS for land application