PONDUS™ Installations
orange-line

PONDUS-Harrisburg-PA-Aerial

Capital Region Water Advanced Wastewater Treatment Facility

Location: Harrisburg, Pennsylvania
Plant Size: 37.7 MGD
Process: PONDUS™ (THP)
Installation: 2024 Start-Up

Salem Ohio Aerial

Columbiana County Wastewater Treatment Plant

Location: Salem, Ohio
Plant Size: 4 MGD
Process: PONDUS™ (THP)
Installation: 2024 Start-Up

PONDUS-Bayreuth-Aerial

Kläranlage Bayreuth

Location: Bayreuth, Germany
Plant Size: 30 MGD
Process: PONDUS™ (THP)
Installation: 2024 Start-Up
PONDUS-Naples-Install

Foce Regi Lagni

Location: Naples, Italy
Plant Size: 15 MGD
Process: PONDUS™ (THP)
Installation: 2024 Start-Up

PONDUS-Bernburg-Install

Wasserzweckverband Saale-Fuhne-Ziethe

Location: Bernburg, Germany
Plant Size: 10 MGD
Process: PONDUS™ (THP)
Installation: 2023

Adapt-2010-11Erlangen-Aerial

Klärwerk Erlangen

Location: Erlangen, Germany
Plant Size: 50 MGD
Process: PONDUS™ (THP)
Installation: 2023

PONDUS-Mettingen-Install

Klärwerk Mettingen

Location: Mettingen, Germany
Plant Size: 15 MGD
Process: PONDUS™ (THP)
Installation: 2021

PONDUS-Goppingen-Install

Stadtentwaesserung Göppingen

Location: Göppingen, Germany
Plant Size: 33 MGD
Process: PONDUS™ (THP)
Installation: 2019

PONDUS-Lohne-Install-1

Löhne-Rießel Wastewater Treatment Plant

Location: Löhne, Germany
Plant Size: 14 MGD
Process: PONDUS™ (THP)
Installation: 2019

PONDUS-Wolfsburg-Install

Kläranlage Wolfsburg

Location: Wolfsburg, Germany
Plant Size: 34 MGD
Process: PONDUS™ (THP)
Installation: 2014/17

thermal-hydrolysis-municipal-kenosha-wisconsin-installation

Kenosha Water Utility

Location: Kenosha, Wisconsin
Plant Size: 28 MGD
Process: PONDUS™ (THP)
Installation: 2014

PONDUS-Uelzen-Install

Kläranlage Uelzen

Location: Uelzen, Germany
Plant Size: 13 MGD
Process: PONDUS™ (THP)
Installation: 2013

PONDUS-Nordhorn-Install

Nordhorn Kommunale Betriebe AöR

Location: Nordhorn, Germany
Plant Size: 16 MGD
Process: PONDUS™ (THP)
Installation: 2013

PONDUS-Ratekau-Install

Kläranlage Ratekau

Location: Ratekau, Germany
Plant Size: 13 MGD
Process: PONDUS™ (THP)
Installation: 2007

PONDUS-Gifhorn-Install

Kläranlage Gifhorn

Location: Gifhorn, Germany
Plant Size: 14 MGD
Process: PONDUS™ (THP)
Installation: 2005

MagPrex™ Installations
orange-line

Nampa-ID-1

Nampa Wastewater Treatment Plant

Location: Nampa, Idaho
Plant Size: 18 MGD
Process: MagPrex™
Installation: 2023

MagPrex-MeridianID-Install

Meridian Wastewater Plant

Location: Meridian, Idaho
Plant Size: 10 MGD
Process: MagPrex™
Installation: 2023

MagPrex-SaltLakeCity-Install

Central Valley Water Reclamation Facility

Location: Salt Lake City, Utah
Plant Size: 60 MGD
Process: MagPrex™
Installation: 2023

Fox-River-Water-Reclamation-District-Elgin-Illinois-1

Fox River Water Reclamation District

Location: Elgin, Illinois
Plant Size: 25 MGD
Process: MagPrex™
Installation: 2021

MagPrex-FtCollinsCO-Install

Drake Water Reclamation Facility

Location: Fort Collins, Colorado
Plant Size: 18 MGD
Process: MagPrex™
Installation: 2020

MagPrex-DenverCO-Install

Metro Water Recovery

Location: Denver, Colorado
Plant Size: 220 MGD
Process: MagPrex™
Pilot Test: June 2016
Installation: 2020

MagPrex-SavageMD-Install

Little Patuxent Water Reclamation Plant, Howard County

Location: Savage, Maryland
Plant Size: 25 MGD
Process: MagPrex™
Installation: 2019

MagPrex-MedinaOH-Install

Liverpool Wastewater Treatment Plant, Medina County

Location: Valley City, Ohio
Plant Size: 15 MGD
Process: MagPrex™
Installation: 2019

View Our MagPrex™ Q&A:
Is Your WWTP Spending Too Much Money on Ferric to Meet Phosphorus Regulations?

CalPrex® Pilot Tests
orange-line

CalPrex-Madision-Pilot

Madison Metropolitan Sewerage District

Location: Madison, Wisconsin
Plant Size: 42 MGD
Process: CalPrex®
Pilot Test: August 2018, April 2018

CalPrex-Woodridge-Pilot

Woodridge Greene Valley Wastewater Treatment Facility

Location: Woodridge, Illinois
Plant Size: 12 MGD
Process: CalPrex®
Pilot Test: September 2017, May 2017, November 2015

Download Our Peer-Reviewed CalPrex® WRF Report

nutrient-removal-wastewater-calprex-wrf-report-2