Case Studies

    Filter By

    Sorry, no results found for the filters selected above.

    UAE Plant Replaces Aging GBTs with Sludge Thickening Centrifuges

    Location: Sharjah Municipality Drainage Department  |  Sharjah, United Arab Emirates
    Plant Size: 79.25 MGD
    Process: THK600 Sludge Thickeners

    Plant Uses Sludge Thickening Centrifuge to Eliminate 50% Transportation Surcharge

    Location: University of Florida  |  Gainesville, Florida
    Plant Size: 3.1 MGD
    Process: THK200 Sludge Thickener

    Plant Replaces Modified Dewatering Centrifuges with Sludge Thickening Centrifuges

    Location: City of Wyoming Clean Water Plant  |  Wyoming, Michigan
    Plant Size: 90 MGD
    Process: THK350 Sludge Thickener

    Plant Uses Sludge Thickening Centrifuge to Thicken WAS Before Digestion

    Location: Whitewater Wastewater Treatment Plant  |  Whitewater, Wisconsin
    Plant Size: 3.65 MGD
    Process: THK200 Sludge Thickener

    Plant Replaces Aging DAFs with Sludge Thickening Centrifuges

    Location: Kenosha Water Utility Wastewater Treatment Plant  |  Kenosha, Wisconsin
    Plant Size: 28 MGD
    Process: THK600 Sludge Thickeners


    LOOKING FOR MORE INFORMATION?